Reference list

YEAR

CLIENT

LOCATION

DESCRIPTION

       

2009

-

Belgium

Preliminary design for dry mortar installation

2008/9

Remix Droge Mortel

Ellertshaar(NL)

Modernization of mixing shop, 1st phase, and connection of packing line.

2008

Remix Dry Mortar

Gravesend(UK)

Realisation of packing line.

2008

Remix Droge Mortel

Ellertshaar(NL)

Realise packing line including soil sanitation and remediation, foundations and construction of the buildings needed and silo capacity.

2007

Sakrete Droge Mortel

Hardenberg(NL)

Modernization of a dry mortar installation, doubling production capacity and expanding sand and finished product silos.

2007

Mourik bouw

Botlek(NL)

Provide environmental and planning permit application for a mobile cement plant.

2007

Remix Dry Mortar

London(UK)

Optimization of software for pneumatic mortar transport system.

2006

Gunnebo Europe

Doetinchem(NL)

Delivery of silo protection and filter system for mortar transport system.

2006

Remix Droge Mortel

Ellertshaar(NL)

Cost reduction by means of “peak-shaving” the gas consumption (savings EUR 25,000 per annum).

2006/7/8

Remix Dry Mortar

Gravesend(UK)

Project to realise a complete new production location for dry mortar.

2005/6

Remix Droge Mortel

Ellertshaar(NL)

Realisation of energy connections for electricity and gas (5 km trajectory).

2005

Remix Dry Mortar

Bristol(UK)

Realisation of 2nd blower line for finished product.

2005

ORION Beton

Enschede(NL)

Study on loading trucks in accordance with VDI 2700.

2005

CMPE

Safi (Marokko)

Develop future vision on layout of factory and site. After stocktaking the situation on site and inventorying the needs (incl. adding a mixer installation), 2 complete proposals need to be worked out.

2005

Remix Droge Mortel

Ellertshaar(NL)

Major maintenance of dryer installation.

2004

Transport Beton Münsterland

Südlohn(D)

Making an old installation ready for production. The installation needs to be tested and training of personnel coordinated. In addition, both the technical and the environmental documentation needs to be updated.

2004

Remix Droge Mortel

Ellertshaar(NL)

Installation of an extra silo for storage of dry sand. The rebuilding also included adjustment of the control system.

2004

Diamant Beton

Hardenberg(NL)

Modernization of mixing shop at concrete brick factory, including replacement of the control system.

2003

Remix Dry Mortar

Londen(UK)

Expansion of existing installation with 2 finished product silos.

2003

Remix Dry Mortar

Bristol(UK)

Expansion of existing installation with separate storage and weighing system for the production of anhydrite.

2001/2/3

Remix Dry Mortar

Bristol(UK)

Design and realisation of a complete dry mortar installation. The installation is equipped with an automatic additive and colouring dosage system. The entire project was fully supported; KEMP provided permanent support during the commissioning and technical acceptance. Capacity of installation 60 tonnes/hour.

2002

Betoncentrale Rijnmond

Rotterdam(NL)

Once the environmental permit had been issued, the complete construction of the plant was finished within a period of 4 weeks (including foundations!). The deadline for the 1st production was achieved exactly. The installation was then rounded off over 4 months during ongoing production. Capacity 100 M3 /hour.

2001

Remix Droge Mortel

Ellertshaar(NL)

Replacement of sand dryer without that hampering production. The new dryer was realised alongside the old installation. The cutover took place during the company’s Christmas closing. Dryer capacity 100 tonnes/hour.

2000

Betoncentrale Twenthe

Doetinchem(NL)

The cement plant needed to be modified for production of special cement for the “Betuwelijn”. The work consisted of examining the possible options and final realisation of the option chosen.

2000

Betoncentrale Twenthe

Hengelo(NL)

Package selection for maintenance management package and support with implementation.

1999

Betoncentrale Twenthe

Doetinchem(NL)

Replacement of entire control system for cement plant. A total production shutdown was finally limited to 2 days because the rebuilding started on Thursday evening and the installation was back in operation on the Tuesday following the weekend.

1998/9

Remix Dry Mortar

Londen(UK)

Design and realisation of a compact dry mortar installation. Work consisted of drawing up an order specification, requesting offers, participating in the purchasing process, construction support, technical and capacity acceptance, training and after-care process. Capacity of the installation 35 tonnes/hour.