Reference list
YEAR |
CLIENT |
LOCATION |
DESCRIPTION |
---|---|---|---|
2009 |
- |
Belgium |
Preliminary design for dry mortar installation |
2008/9 |
Remix Droge Mortel |
Ellertshaar(NL) |
Modernization of mixing shop, 1st phase, and connection of packing line. |
2008 |
Remix Dry Mortar |
Gravesend(UK) |
Realisation of packing line. |
2008 |
Remix Droge Mortel |
Ellertshaar(NL) |
Realise packing line including soil sanitation and remediation, foundations and construction of the buildings needed and silo capacity. |
2007 |
Sakrete Droge Mortel |
Hardenberg(NL) |
Modernization of a dry mortar installation, doubling production capacity and expanding sand and finished product silos. |
2007 |
Mourik bouw |
Botlek(NL) |
Provide environmental and planning permit application for a mobile cement plant. |
2007 |
Remix Dry Mortar |
London(UK) |
Optimization of software for pneumatic mortar transport system. |
2006 |
Gunnebo Europe |
Doetinchem(NL) |
Delivery of silo protection and filter system for mortar transport system. |
2006 |
Remix Droge Mortel |
Ellertshaar(NL) |
Cost reduction by means of “peak-shaving” the gas consumption (savings EUR 25,000 per annum). |
2006/7/8 |
Remix Dry Mortar |
Gravesend(UK) |
Project to realise a complete new production location for dry mortar. |
2005/6 |
Remix Droge Mortel |
Ellertshaar(NL) |
Realisation of energy connections for electricity and gas (5 km trajectory). |
2005 |
Remix Dry Mortar |
Bristol(UK) |
Realisation of 2nd blower line for finished product. |
2005 |
ORION Beton |
Enschede(NL) |
Study on loading trucks in accordance with VDI 2700. |
2005 |
CMPE |
Safi (Marokko) |
Develop future vision on layout of factory and site. After stocktaking the situation on site and inventorying the needs (incl. adding a mixer installation), 2 complete proposals need to be worked out. |
2005 |
Remix Droge Mortel |
Ellertshaar(NL) |
Major maintenance of dryer installation. |
2004 |
Transport Beton Münsterland |
Südlohn(D) |
Making an old installation ready for production. The installation needs to be tested and training of personnel coordinated. In addition, both the technical and the environmental documentation needs to be updated. |
2004 |
Remix Droge Mortel |
Ellertshaar(NL) |
Installation of an extra silo for storage of dry sand. The rebuilding also included adjustment of the control system. |
2004 |
Diamant Beton |
Hardenberg(NL) |
Modernization of mixing shop at concrete brick factory, including replacement of the control system. |
2003 |
Remix Dry Mortar |
Londen(UK) |
Expansion of existing installation with 2 finished product silos. |
2003 |
Remix Dry Mortar |
Bristol(UK) |
Expansion of existing installation with separate storage and weighing system for the production of anhydrite. |
2001/2/3 |
Remix Dry Mortar |
Bristol(UK) |
Design and realisation of a complete dry mortar installation. The installation is equipped with an automatic additive and colouring dosage system. The entire project was fully supported; KEMP provided permanent support during the commissioning and technical acceptance. Capacity of installation 60 tonnes/hour. |
2002 |
Betoncentrale Rijnmond |
Rotterdam(NL) |
Once the environmental permit had been issued, the complete construction of the plant was finished within a period of 4 weeks (including foundations!). The deadline for the 1st production was achieved exactly. The installation was then rounded off over 4 months during ongoing production. Capacity 100 M3 /hour. |
2001 |
Remix Droge Mortel |
Ellertshaar(NL) |
Replacement of sand dryer without that hampering production. The new dryer was realised alongside the old installation. The cutover took place during the company’s Christmas closing. Dryer capacity 100 tonnes/hour. |
2000 |
Betoncentrale Twenthe |
Doetinchem(NL) |
The cement plant needed to be modified for production of special cement for the “Betuwelijn”. The work consisted of examining the possible options and final realisation of the option chosen. |
2000 |
Betoncentrale Twenthe |
Hengelo(NL) |
Package selection for maintenance management package and support with implementation. |
1999 |
Betoncentrale Twenthe |
Doetinchem(NL) |
Replacement of entire control system for cement plant. A total production shutdown was finally limited to 2 days because the rebuilding started on Thursday evening and the installation was back in operation on the Tuesday following the weekend. |
1998/9 |
Remix Dry Mortar |
Londen(UK) |
Design and realisation of a compact dry mortar installation. Work consisted of drawing up an order specification, requesting offers, participating in the purchasing process, construction support, technical and capacity acceptance, training and after-care process. Capacity of the installation 35 tonnes/hour. |